B2B

B2B

B2C

B2C

+49 89 43759523

+49 89 43759530

DESIGN, PRODUCTION AND DISTRIBUTION

In the second half of 2013, preparatory work has started for the construction of the production facility; implementation in 2014-2015

In the second half of 2013, preparatory work has started for the construction of the production facility; implementation in 2014-2015

The stable growth of sales and the need to respond quickly to customer demand are key factors in the implementation of a long-term expansion plan and increasing the production capacity of the Production and Distribution Center located in Poland. Opening the logistics facility in August this year will allow us to move on to the next stage of work, i.e. preparatory work for the construction of manufacturing halls. The preparatory phase is to be completed by the end of 2013. The implementation and commissioning of the new facility will take place in 2014-2015. Starting a facility where the production and industrial assembly of parts is to be carried out is an important element of the development strategy of Master-Sport Automobiltechnik (MS).

 class=
WYDARZENIA

Nadchodzące wydarzenia:

Automechanika Shanghai 5 – 5.12.2024 Automechanika Dubai 10 – 12.12.2024 EquipAuto Algeria 17 - 20.02.2025 Autopromotec Bologna 21 - 24.05.2025